10 Critical Path: Part Four
1HAVING COMMITTED OURSELVES to solving humanitys problems with artifacts, we can use the Geoscope and World Gaming strategies as a test-bed, and can now sort out which comes first of various artifacts-all of which are going to be needed to get Spaceship Earth operating omni-cooperatively on behalf of all.
2 Not only may we begin to make the whole world work for all humanity but incidentally to actualize the human functioning in Universe as local information-gatherers and local problem-solvers in support of the eternal regeneration of Universe itself.
3 No single move can bring us more swiftly in the direction of complete overall de-sovereignization,
unblocking the free flow of technologies and resources, than that of instituting the world-around
integrated electrical energy network fully described in the Introduction to this book and the
World Game chapter.
Change: add ref
4 Next in artifact design priority to the integrated world electrical energy network comes the physical-environment-controlling equipment of world around humanitys momentarily geographically fixed activities-fixed in contradistinction to humanitys swiftly mobile environment-controlling artifacts such as automobiles, buses, trains, airplanes, and satellites. So seemingly stationary are city skyscrapers that few think about the fact that all their parts have been transported from far away and that many of those parts and materials have been inter-transported many times in the course of their production and assembling. As of 1980 the average U.S.A. family moved out of town to a new location every three years. They do so primarily in readjusting human production functions to relocated factories and offices and to new airport and shopping centers living-local convenience.
5 When I speak of mobile dwellings, I do not refer to camping trailers or tents, I speak of those dwellings which will stay geographically fixed for many months or years but which are readily and economically transportable and re-installable over wide ranges of distance.
6 As I have mentioned before and now repeat in a more comprehensive manner, in 1800 the average human being was walking an annually cumulative distance of 1100 miles and riding ten additional annual miles. By 1900 the average human being was yet walking a total of yearly distance of 1100 miles but the average U.S.A. citizens plannual vehicle-ridden miles had increased to 400. All humanity is as yet in 1980 walking an annual average of 1100 miles but in the U.S.A., Europe, and parts of the Near East, Asia, Africa, and Australia, all men, women, and youngsters free to travel, are averaging over 20,000 plannual miles of vehicular travel.
7 Class-one evolution has all humanity progressively cross-breeding to produce an integrated world human race. If we pass our present cosmic examination to continue aboard planet Earth in Universe, the to-and-froing of humanity will increase rapidly. The motion patterns of humanity, as also mentioned earlier, are pulsating between ever more widely convergent and divergent to-and-froing. Two main types of environment controls are required: a whole city under one dome for convergent phases of human living and single-family or small group air-deliverable domes for remote deployment for skiers, geologists, artists, and others.
8 * * *
9 Since 1927 I have been deeply involved with the issue of making high performance shelter available to all humanity. By high performance I mean such environment-controlling shellsand their survival equipmentas can be produced only by the most advanced aircraft and space technology and the latters level of technical problem-solving. In 1927 I anticipated a fifty-year-long gestation period for a new building industry. Since 1977 was the fifty-year target date, I began the prototyping of my Flys Eye dome, which embodied design attention to all that I had learned not only throughout that fifty-year development period but in all my thirty-two earlier years. They will not be sold. Like telephones, they will be rent-able.
10 The Flys Eye uses a very few types of nestable, mass-produced fiberglass, sheet aluminum of thin gauge, or polyester-coated sheet steel components that, when assembled, produce a 5/8 sphere of the Hex-Pent geodesic configuration. As with the ports and pores of all organic systems, the size and shape of these openings sort, sieve and classify the inbound and out bound physical-component traffic of metabolic regeneration which the Flys Eye domes embody.
11 The Flys Eye domes pores are all seven-foot-diameter circular openings. These circular openings serve alternately as doors, vents, solar-energy-cell mounts, etc. The circular openings constitute three-fourths of the surface area of the domes, while the manufactured shell-structure components constitute only one-fourth of the structures surface. Since the circles have rigid rims, the closure of the circles can be accomplished by two, spread-apart drumheads of tensed, thin film or fabric materialsergo, at low relative cost.
12 The structural shell components constitute a comprehensive leakproof, watershedding system that, with the circular openings covered, leads all rain and melting snow into the shells watercourse cisterning system. The cylindrically rimmed circular openings will be tensilely covered with opaque, translucent, or transparent glass, plastic film, metal glazing or screening, or some combination thereof. They will serve as energy harvesters in the operation of the dwelling by parabolically collecting incoming energy in sunlight foci, liquid-heating cells and by circular-opening-mounted, wind-drag-driven, air turbines.
13 Flys Eye domes are of two sizes. The smaller twenty-six-foot-diameter one is constructed of only one type of mass-produced, strong, lightweight, hyperbolic-saddle-form component; the larger fifty-foot-diameter one is comprised of only two types of mass-produced structural shell and watershed-constituting components, which are also of the hyperbolic-saddle type.
14
FIGURE 40.
17 Flys Eye dome transported by helicopter
18 FIGURE 41.
19 Both twenty-six-and fifty-foot-diameter domes can consist of two concentric identical domes with a space of six inches between and no metallic interconnectorsthis spacing produces highly effective insulation as well as an excellent hot-and cold-air ducting system. The concentric domes interconnection is accomplished with a seven-foot-diameter outside circle and six-inch-deep conic tubes made fast at the seven-foot outside end of the circular openings of the spheres.
20 The smaller Flys Eye provides the optimally workable fundamentals for comfortable, efficient living in a two-story shelter. It is small compared to a conventional house, but huge next to a van, camper, or almost any of the thousands of yachts enthusiastically occupied while tied up at the marina slips. Optimum use of space will be important.
21 The larger Flys Eye is fifty feet in diameter, capable of enclosing three or more stories (each of 2000-square-foot floor area), a garden, trees, and a pool. While also equipped with all the living essentials at different levels, its space utilization will be quite different from the smaller Flys Eye-the fifty-footer accommodates what we call the Garden of Eden living-living in a garden.
22 The Flys Eye domes are designed as components of a livingry service.
23 The basic hardware components will produce a beautiful, fully equipped, air-deliverable house that weighs and costs about as much as a good automobile. Not only will it be highly efficient in its use of energy and materials, it also will be capable of harvesting incoming light and wind energies. The software part of the product will include a service industry to airor highwaytransport, install, lease, maintain, remove, and relocate the domes or their separate hardware components. And as mentioned, they will not be sold.
24 Both the twenty-six-and fifty-foot Flys Eye domes are semiautonomous-i.e., have no sewer, waterpipe, or electric-power-supply connections. The personal hygiene, clothes-and-utensil-washing functions are accomplished with the high-pressure, compressed air and atomized water fog gun which requires only a pint of water per hour.
26 FIGURE 42. Flys Eye dome with trussed flooring
28 FIGURE 43. 50-foot-diameter Flys Eye dome prototype
29 The human excrement is sittingly deposited in the dry-packaging toilet. The human sits on fresh, plastic-film-covered, fore-and-aft seat halves. The excrement falls into the top-open plastic tube as it is formed by the two converging edges of the two plastic sheets, which are then electrosealed together from the originally separate two plastic film rolls, whose filmstrips first covered the two seat-sides. The hermetically sealed-off tubular section containing the excrement is then mechanically detached and conveyed away as litter to be neatly packed in a corrugated carton clearly marked for pickup and dis-patch to the methane-gas-producing plant and the dry-powder fertilizer manufacturer or to be processed into methane gas and fertilizer powder by accessory equipment of the dome home itself.
30 * * *
31 Having undertaken the solution by artifacts of the worlds great housing crisis, I came to regard the history of cities. Cities developed entirely before the thought of electricity or automobiles or before any of the millions of inventions registered in the United States Patent Office. For eminently mobile man, cities have become obsolete in terms of yesterdays functions-warehousing both new and formerly manufactured goods and housing immigrant factory workers. Rebuilding them to accommodate the new needs of world man requires demolition of the old buildings and their replacement of the new and now obsolete real estate, streets, water and sewer lines, and yesterdays no longer logical overall planning geometries. I sought to take on this challenge and developed plans for an entirely feasible and practical new way for humans to live together economically. Old Man Rivers City is one such design.
32 Old Man Rivers City, undertaken for East St. Louis, Illinois, takes its name from the song first sung by Paul Robeson fifty years ago, which dramatized the life of Afro-American blacks who lived along the south-of-St. Louis banks of the Mississippi River in the days of heavy north-south river traffic in cotton. Cessation of the traffic occurred when the east-west railway network outperformed the north-south Mississippi, Mexican Gulf, and Atlantic water routes, which left many of its riverbank communities, such as East St. Louis, marooned in economic dead spots. East St. Louis is an American city over-whelmed by poverty. Its population of 70,000 is 70 percent black.
33 I originally came to East St. Louis to discuss the de-sign and possible realization of the Old Man Rivers City, having been asked to do so by East St. Louis community leaders themselves, being first approached by my friend Katherine Dunham, the famous black dancer. At the community leaders request I presented a design that would help solve their problem. It is moon-crater-shaped: the craters truncated cone top opening is a half mile in diameter, rim-to-rim, while the truncated mountain itself is a mile in diameter at its base ring. The city has a one-mile-diameter geodesic, quarter-sphere, transparent umbrella mounted high above it to permit full, all-around viewing below the umbrellas bottom perimeter. The top of the dome roof is 1000 feet high. The bottom rim of the umbrella dome is 500 feet above the surrounding terrain, while the crater-top esplanade, looks 250 feet radially inward from the umbrellas bottom, is at the same 500-foot height. From the esplanade the truncated mountain cone slopes downwardly, inward and outward, to ground level 500 feet below.
34 The moon craters inward and outward, exterior-surface slopes each consist of fifty terraces-the terrace floors are tiered vertically ten feet above or below one an-other. All the inwardly, downwardly sloping sides of the moon craters terraced cone are used for communal life;
35 its outward-sloping, tree-planted terraces are entirely for private life dwelling.
36 The private-home terraces on the outward circular bank are subdivided by trees and bushes to isolate them one from the other. This garden-divided exterior terracing hides the individual private-home terraces from one an-other while permitting each an unobstructed view out-ward to the faraway landscape. Thus landscape-partitioned from one another, the individual homes beneath the umbrella dome do not need their own separate weather roofs. The experience will be that of living out-doors in the garden, without any chance of rain and out of sight and sound of other humans, yet being subconsciously aware that your own advantage is not at the expense of others zonal advantage.
37 The floors of the individual homes on the outward ter-raced slopes penetrate inwardly of the mountainside to provide an 85-percent-enclosed family apartment set back into the mountains surface. Each familys apartment floor area totals 2500 feet, being 100 feet inwardly extended and twenty-five feet, one inch, wide at its out- side terrace front line and twenty-five feet at its innermost chord line. Each apartment occupies only one six-hundredth of the circles 360 degrees of arc. In addition there will be 1300 square feet of public space for each of the 25,000 families that Old Man Rivers City will accommodate on the fifty interior, communal, terraced slopes of the crater city.
38 The geodesic-sky parasol-umbrella protects the whole of Old Man Rivers City from rain or snow. The sky dome is transparent. Its aluminum-and-stainless-steel-trussed structure will be covered in two alternate ways: (1) glazed with wire-reinforced glass-ergo, fireproof; (2) with a pneumatically filled, glass-cloth-pillowed umbrella. The dome will admit all biological, life-supporting Sun radiation. The great umbrella is a watershed whose runoff is collected in a dome-level reservoir for a high-pressure fire sprinkler and service purification system, after which the reservoirs overflow is piped downwardly to a dome-surrounding moat reservoir.
39 The interior-most, circular diameter ground level of Old Man Rivers City is twice the size of the playing-ground area of any of the worlds large athletic stadia. This means that it has about four times the interior horizontal area of a regulation football stadiums oval ground area.
40 The terraced (angle of repose) slopes of Old Man Rivers City, both outside and inside, are very gradual slopes and are thus unlike the steeply tiered athletic stadiums seating slopes. The angular difference is like that of a reclining chair versus an upright chair.
41 Many of the lower tiers of Old Man Rivers Citys interior terraces have enough horizontal surface to accommodate groups of tennis courts, whole school and play-ground areas, supermarkets, outdoor theaters, etc. The terraces are of graduated widths. With the narrowest at the top, they become progressively wider at each lower level.
42 Inside-that is, below the moon craters three-and-a-half-mile-circumferenced, surface-terraced mountain massare all the communal services not requiring daylight: for instance, all the multilevel circumferential trolley-ways, interlevel ramps, roadways, and parking lots, with numerous radial crosswalks and local elevators. There are radial crosswalk bridges at every four terrace levels. These provide bridgesnever more than two decks up or downfor walking homeward, outwardly from the interior community bowl, to ones individual, terraced, tree-hidden dwelling area. In addition to the foregoing interior structuring and facilities, the factory, office and parking space within the crater mountain is colossal-about ten million square feet. The city is as complete a living, working, studying, and playing complex as is a great ocean passenger shipbut without the space limitations im-posed by the ships streamlined forming to accommodate swift passage through the seas.
43 Because its lifestyle will be so vastly improved over present-day living, Old Man Rivers City has been de-signed to accommodate 25,000 familiesi.e., 125,000 humans-though East St. Louis has now only 70,000 humans grouped in 14,000 families.
44 There are many exciting consequences of Old Man Rivers City community life being introverted and its private life extroverted.
45 Within the interior community bowl everyone can see what all the rest of the community is doing, as do the 125,000-member audiences of our present-day great bowl games see all the other humans present, though indistinctly at the farthest distances. The difference in Old Man Rivers City experience will be that each of its 125,000 individuals will have an average of 260 square feet of communal-terrace roaming space versus the six square feet of seating space of the football stadium fani.e., the OMR citizen will average forty-three times as much free space as does the football fan.
46 From the individual, external home terrace on the craters outer slopes one can see no humans other than those within ones own familys home-terrace domain. People can look outwardly, however, from Old Man Rivers City as far as the eye can see at the interesting Mississippi River scenery outside the moon craters umbrella limits.
47

Outer Perimeter 4750m
49 Total Undercover Area 1,767,146 M
50 FIGURE 44.
52 Figure 45. Model of Old Man Rivers City (elevation)
54 Figure 45 a. Model of Old Man River1s City (aerial view)
56 Plan view of Old Man Rivers City, East St. Louis, Illinois
57 Figure 46.
58 The Old Man River Citys home views are analogous to those of individuals living in dwellings on mountainsides, such as those of residents on the hills of Hong Kong ls-land or those above Berkeley, California. Such hillside dwellers overlook vast, mysteriously inspiring scenic ar-eas, ever-changing with the nights, days, and weather.
59 The total roof surface area of the one-mile-diameter, quarter-sphere dome is only 2 percent that of the total roof and exterior skin surface area of all the buildings standing on an equal ground area in any large conventional city. The amount of external shell surface through which each interior molecule of atmosphere can gain or lose heat is thus reduced by 98 percent. Another energy-conservation factor is operative, for every time we double the spheres diameter, we increase its surface by four and its volume by eight. Therefore, the energy efficiency doubles each time we double the dome size. This means that the structural efficiency, useful volume, and energy conservation are all at optimum in the Old Man Rivers City project. Throughout the year Old Man Rivers City will have a naturally mild climate. With a large, aerodynamically articulated, wind-and-weather-controlled ventilator system atop and round the dome, together with the 500-foot-high vertical opening that runs entirely around the city below the umbrella, the atmospheric controllability will guarantee fresh air as well as energy conservation. The umbrella will jut out above and beyond all the outer-slope residential terrace areas as does a grandstand roof, so that neither rain nor snow will drift horizontally inwardly, being blocked from doing so by the mass inertia of the vast quantity of atmosphere embraced by the umbrella as well as by the vertical mass of the craters cone within the dome.
60 Optimum efficiency also characterizes the way in which Old Man Rivers City is to be produced. The three-and-a-half-mile circumferential moon crater and its terracing will be developed entirely with modem, high-speed, highway-building equipment and earth-moving techniques as well as with suspension-bridge-building and air-space technologies. Construction will begin with installation of a set of concentrically inter-switching railway tracks, with tangential shunting bypass tracks, on which great cranes and other machinery will travel. The mammoth, 500-feet-high and 2000-feet-wide-based, A-frame-shaped, circumferential segments of the crater become highly repetitive and economically producible. There will be 100 columns rising from the A-frame tops at the craters top-rim esplanade. These 100 columns will be 500 feet high and will be spaced forty meters apart, mounted above the A-frames.
61 The tops of the 100 columns will be 1000 feet high and will be capped by a circumferential ring.
62 The whole terraced crater structure, inside and out, will be of thin-wall reinforced concrete. This terraced shell will be cast-mounted upon, and will thus encase, an inverted, kitchen-sieve-like, domical basket, consisting of an omnitriangulated, quarter-sphere geodesic, basket-bowl, suspension web of fine-diameter, high-tensile steel rods and wires. The spider-fine steel web basket will be suspended from the A-frame tops at the base of the 100 columns. The whole structure is, in effect, a circular, triangularly self-stabilizing, suspension bridge-principled, terraced, ferroconcrete bowl with the human occupants and their goods constituting only a small fraction of the stress loads of equimagnitude highway traffic bridges.
63 The 1500-meter-(one-mile) diameter dome itself will be a horizontal wire wheel suspension consisting of an octahedral-tensegrity-trussed, one-quarter sphere geodesic dome suspended horizontally from the 100 circumferential columns. This method means mounting the dome one-quarter of a mile inwardly from the one-mile-diameter parasol domes outer rim. This results in an inner clear span of only one-half mile, a distance comparable to that of the Golden Gate Bridges central clear span between its two masts.
64 I said to the East St. Louisans at the outset that our first resolve must be not to compromise our design solution in order to qualify for any private foundation or government subsidy funds. Three-quarters of the United States national debt of almost $1 trillion and much of the private debt, which altogether transfers $25 billion a year interest from our nations pocketbooks to the banks and insurance companies, has been amassed through government building subsidies that were designed strictly as money-makers for bankers, real estate operators, and handcraft building-industry interests. The funds were not amassed in the interest of the individuals and the community. I advised the East St. Louisans that we must develop our design and its production and assembly logistics strictly in terms of the individual and the communitys best interests. I said that if we solve the human problem and do so in the most economical and satisfactory manner, independent of building codes, zoning restrictions, etc., while employing airspace technology, effectiveness, and safety, we will do that which no subsidized housing thus far has done. I pointed out that, with increasing socio-economic emergencies, the economic support will ultimately materialize simply because we have what world-around humanity is looking for and needs. The money-making solutions of housing are exactly what humanity is not looking for but has had to accept, lacking any alternatives.
65 The East St. Louis schoolchildren are soon to be provided with a fifty-foot-diameter miniature OMR moon-crater city with which (and on which) to play, simulating actual living conditions. The children will furnish its terraces with miniaturized, scale-model equipment, landscape material, athletic facilities, interior transportation equipment, factories, and similar materials they will de-sign and make. As the political leader of East St. Louis, who was formerly principal of its largest high school, says, By the time Old Man Rivers City gets completed, our present high school students will be its grown occupants, and they might just as well start right now using their imaginations in play living in and operating it. Fabricating and assembling the model itself will be in strict conformity with the full-scale operation.
66 At the outset meeting of our OMRs Citys development, I told the East St. Louisans that I would develop the design and models at my own expense and do so without fee. I said that what I would design must be so right that the entire community would fall in love with itor it would be dropped. I said that if they did fall in love with it, I would carry on with all the development expense and that they must not allow the project to become a political football. It was fortunate that the East St. Louis community did fall spontaneously in love with the design. This held the project together through many critical moments of preliminary challenges of its validity and practicability. There were many critical meetings wherein skeptics, some of them powerful political activists, declared that this design, with its domed-over interior community and exterior private-dwelling terraces, might be part of its social enemys conspiracy to entrap them. Fortunately the design gradually explained itself, until all the leaders of the communitys diverse factions-political, ethnic, and economic, as well as the citys engineer-all agreed on its desirability.
67 I have been greatly aided in the Old Man Rivers City development by a group of volunteer architectural students from Washington University in St. Louis and, above all, by Professor James Fitzgibbon, head of Washington Universitys architectural school. As I am absent a great deal due to my world traveling, Jim, who is one of my best, lifelong friends, has been locally in command of the development. Most powerful support of the East St. Louisans has been provided by Wyvetter Younge, Carl Utchmann, and Bob Ahart.
68 Both the East St. Louis and St. Louis newspapers and radio and television stations have given good and favorable reception to the project. Now world-around interest in the Old Man River project is beginning to be manifest. As interest grows, more and more articles are being published about it, despite its having no public relations or advertising promotion. Quite to the contrary, I have asked the community to let the project gestate at a natural rate. Answer questions faithfully when they are asked, but otherwise be silently at work.
69 As the first favorable publicity occurred, it was inevitable that Illinoiss political representatives would quickly of-fer the East St. Louisans their aid in securing government funds, which funds, however, would involve so many restrictions and compromises as to utterly emasculate the OMR Citys design rationale. Thus it was a second victory for the project when I was able to dissuade the community from being tempted by the millions of dollars tendered them.
70 I have never engaged in a development that I have felt to have such promise for all humanity, while being, at the same time, so certain of realization, because its time is imminently at hand.
71 * * *
72 In 1951, at North Carolina State University at Raleigh, I designed an automated cotton mill.
73 Situated upon the banks of many New England rivers and employing the latters waterpower, all the great cotton mills of the nineteenth-century U.S.A. were built four stories high. They used giant pulley wheels mounted on the hubs of their great main waterwheels to drive leather belts which led slantingly upward into the mills top floors and thence to the ceiling-hung, pulley-driven shafting mounted under the ceilings of each of the mills four floors. There were many pairs of pulleys, their axes hung in parallel. Each driving wheel had its own idler wheel. When the belts were shifted over from the idler to the driving wheel, they drove the wheels of their respective ma-chines of the various types of cotton mill machinery, which was positioned just below the ceiling-hung shafts. To operate those early-in-the-nineteenth-century mills the owners imported whole town-size armies of immigrants, who settled into the companies houses. Having no other sources available, the mill workers bought all their sup-plies from the company stores. Their wages were mini-mal. After one-half a century the organized-labor movement forced wage increases for them.
74 In the early twentieth century the cotton-manufacturing business owners abandoned their New England mills and moved their machinery into the Southern states, where homes need not be heated and where they could reach a low-cost labor market. Instead of the belting, overhead shafting, and pulleys, they used the World-War-I-developed electric motor drives for each separate machine. This freedom from a shafting-and-waterpower-driven system economizedly (which is not al-ways most economically) called for single-story factories with large roof areas. The latters black tar and gravel roofs impounded vast quantities of Sun heat, which in tum produced many internal environment-control problems.
75 Before that southward cotton-milling migration my earliest job before World War I had been as an apprentice cot-ton millwright (cotton machine fitter). The new mill we were equipping with machinery was located in Sher-brooke, Quebec. Most of the machinery was manufactured in Lancashire, England, some in France. Working first as a helper to the Lancashire master machine fitters, I learned how to put together by myself every one of the various kinds of cotton mill machines. These began with the cotton bail openers at railroad track level and the blowing of the cotton to the top (fourth) floor of the mill, af-ter which the cotton went through the pickers, combers cards, and slubbers, all of which gradually cleaned and formed the cotton into a continuous single strand of cot-ton, which strands then ran through the twisters, into thread-spinning machines, and thereafter into cotton cloth weaving machines.
76 Eventually, together with other fitters, I taught the cot-ton mill workers how to operate their machines. It was a powerful and valuable experience. It was synergetic-behavior of a whole system unpredicted by the behavior of any one of its parts only separately considered.
77 Fifty years later, with much other experience including the development of large geodesic domes, I found I could build a large spherical environment control for much less expense in materials and labor than was required to produce the traditional one-story-high Southern cotton mill. Inside the great column-free space of the clear-span geodesic sphere, an octet-truss mast structure would support many levels of surrounding, outwardly cantilevered, octet-truss platforms.
78 In the great steamships of yesterday the engine room area occupied a very large part of the ships interior space. This was occupied by large equipment, such as three-decks-high engines and boilers. In place of decks these engine rooms had open-grating platforms, walk-ways, and stairways, all open for seeing through and for free circulation of the air.
79 In 1952, at the university in Raleigh, North Carolina, I was asked to lead a full-term design problem in their department of architecture. I proposed the designing and de-tailed scale-modeling of a large spherical cotton mill within which-and not touching the sphere-would be open-frame grating platforms supported by octahedron-tetrahedron trusses cantilevered outwardly around the central mast at many levels, with the octet-trussed plat-forms occurring only where the machinery was to be situated. In the conventional Southern one-story cotton factory all the machines are on one single floor, requiring the horizontal transfer of the semiprocessed cotton products of one machine to the next machine in the manufacturing sequence. In mill terms this carry-across-of-product is called doffing. In my vertical mill proposal all doffing was eliminated. The first processing machinery would be situated on a cantilevered open truss at the highest point around the mast, inside the dome, and the products would start a continuous downward flow from one machine to another accomplished exclusively by gravity. No doffing would be required.
80 I designed this factory in conjunction with North Carolina State Universitys top cotton mill professors as well as with the operating superintendents and other industry experts from neighboring mills. All the cotton mill machinery companies sales engineers participated in the project, which was being run for the senior class in architecture of North Carolina State University. (North Carolina State University happens to be the leading university in the cotton manufacturing area of the South, and has more engineers in that trade than can be found anywhere else.) We de-signed this factory to be completely automated. Inadventently it became extraordinarily beautiful. (See Figs. 47, 47a and 47b.)
82 FIGURE 47. Model of automated cotton mill, Raleigh, North Carolina
84 FIGURE 47a. Model of automated cotton mill, Raleigh, North Carolina (interior detail)
86 FIGURE 47b. Cross-section of Raleigh cotton mill
87 When the cotton mill owners moved their mills from New England into the Southland, they did not move their own homes. They remained deliberately remote from any labor hassling. When I developed this new mill, which all the professionals considered to be a great improvement, the ownership of the cotton mills was so far away from where the mills are located that the owners heard nothing of our new cotton mill development. The people who managed the mills for the remote owners were economists and statisticians, seeking only to squeeze every cent out of costs. They had no engineering-design analytical capability.
88 They sought only to reduce labor costs. Nobody was then considering new cotton-manufacturing technology. It was assumed that all possibilities of improving the manufacturing processes had been exhausted long ago. As a consequence the cotton mill owners paid no attention whatsoever to the mill I designed; the North Carolina State cotton-manufacturing engineering scientists who participated in the project agreed that my spherical, gravity-serviced mill was optimally efficient and highly desirable. The design exists. We probably will see it adopted one of these days. That is the way with critical-path items. They come into use only when class-one evolution needs them.
89 * * *
90 In the following year, 1952, at North Carolina State University I introduced the idea of what I called the mechanical Growth House. At that time I knew how to construct-and had already constructed-many geodesic domes. Some were enormous, spherical environment controls. As mentioned before, ever-larger spheres have ever-less surface area per unit of enclosed volume. Doubling a domes diameter increases its surface fourfold while increasing its volume eightfold. Large domes can be completely transparent, allowing ultraviolet radiation to enter wherever necessary to support the growth of vegetation and the latters impoundment of Sun energy through photosynthesis. Transparent domes can also be opaquely shuttered or mirrored where desired. It is highly feasible to produce two concentric, translucent spheres, the outer one being, for instance, 100 meters in diameter, and the inner one being four meters less in diameter than the outer one and having no metal conductors running between their two plastic and fiberglass intertrussed surfaces and with top and bottom, remotely controlled openings in both domes.
91 The southeastern United States has more of what we think of as individual farmers than anywhere else in this country. North Carolina State University, Cornell, and Iowa State University, are the leading agricultural–engineering-sciences schools in America. It was at North Carolina State that, in conjunction with the Growth House, I conducted comparative studies into (1) the economics of individually operated versus business-corporation-operated farms and (2) the critical-limit size and other conditions of individually owned and personally operated farms versus those same questions for corporation-operated farms. I also made comparative studies of farms operated by the very rich as tax write-offs versus the few little subsistence farms, such as those owned by the small tobacco farmers in North Carolina, which are worked entirely by the resident owner-farmers. These latter are very personal types of operation, in which the farmers carefully watch their crops, even to each tobacco leaf, to get the best out of their investment in the land. These little tobacco farms and certain subsistence farms were quite a different type of eco-technical game than that of the huge conglomerate-owned multi-thousands-of-acres farm operations. The small, individual farmers soon learned all the ways in which the government could help them run their farms.
92 For instance, the U.S. government at the time of the New Deal helped the small farmers by underwriting the cost of constructing little local dams on their land, which produced small ponds and lakes that the government stocked with fish. These new energy sources greatly increased the farmers crop yields and earnings.
93 From that time on the farms began to hold the water that fell on them. People like myself who were light-plane flyers began to notice as we flew westward cross-country that, late in the afternoon with the Sun in the west, its brilliance began to reflect from the myriads of these little newly dammed farm ponds. Soon the glare of these farm ponds became almost blinding to the airplane pilot; before that period the farmland had been a dark carpet at dusk.
94 Overnight the New Deal had captured all that water for all those farms and had stocked them with highly reproductive fish.
95 I found that North Carolina State University at Raleigh was a great place to discuss the idea of a Growth House because the plant physiologists there were some of the best agricultural scientists I could find in America.
96 These scientists agreed with me about the desirability of producing a Growth Housean enormous clear-span sphere with no interior bearing walls or columns. It would have a great central mast around which, one above the other, would be cantilevered octahedron-tetrahedron arms, like branches of a tree extended at successive lev-els. The horizontally rotatable arms would carry the growing plants, with their roots hung in trays. The Growth House would be a multi-tiered-tray agriculture. Tray agriculture had already been studied a great deal in North Carolina and had been successfully developed. (Ive had some very satisfactory tray-growing experiments.) We then went on to find that inside the great sphere we could atomize the water, atomize all the chemical fertilization, and immerse the plants in a Sun-and-nutriment-filled atmosphere that would produce the greatest growth in a given time. The growth-supporting, rotatable arms could be separately rotated for cultivation. All the resultant food grown would gradually work downwardly by gravity, finally to be packaged or canned automatically and delivered in cases out through the bottom. This Growth House is completely designed and ready to be produced. If it were to be used to produce the new winged bean, the life-support worth of its product would be enormous.
97 Referring back to my designing of the Dymaxion House of 1927that of producing an environment most favorable to a living organisms growth and to its dynamic process, and doing so in the most economically pleasing and safe manner-we found that in designing our North Carolina Growth House we had used the same principles for inventorying its essential functions as those we had employed in designing the 1950–1956 North Carolina cotton mill and subsequent projects. Considering in some detail how such a most favorable environment can be arrived at, we see that, in the first place, we wished to have clear space wherever possible. Needing no interior bearing columns or walls, we would interrupt our enclosed space only when we had some service that we needed at that point. There would be no walls or partitions that arbitrarily stopped you from passing through. Space would be bro-ken up only by devices that served you at preferred locations-for instance, by a bathroom or a clothes-storage device.
98 * * *
99 I saw in 1927 that all storage may be divided into two classes-things we rest on shelves, held in horizontal dis-play by gravity, and things we hang vertically, with gravity always maintaining the economy of individual display. The horizontal storage we developed in the Dymaxion House is very different from the drawers of a conventional bed-room bureau. I developed what I called O-Volving shelves and storage walls. The storage walls had two parts: a hemi-circular revolving coat closet and shoe rack structured with aluminum tubing (see Fig. 48). This hemi-circular hanger tube hemirevolved around a center axle with an ample amount of room for vertically hanging all clothing, short or long; and with a hemicircular shoe rack, rigged horizontally below the bottom of hung dresses, coats, etc. The revolving coat closet had also the advantage of coming out into a room so you could pick things out very neatly instead of having to reach back blindly into a closet.
101 FIGURE 48. Storage walls 730
102 The horizontal O-Volving shelves operated like a paternoster, using vertically rotated circular chains (similar to a bi-cycle chain but more powerful) with geared wheels at top, vertically rotating the bicycle-chain-supported hanging shelves. The shelves were suspended in such a way that they would never tilt, yet were strong enough to support great weights. On pressing a button, electric motors rotated the two top sprocket wheels, from both of which, mounted at both ends of the rig, the bicycle-type chain loops were suspended. Each shelf in turn would appear swiftly at a single horizontal opening in the storage wall, positioned at a height safe from the reach of children.
103 With these shelves children would never have to be told, Dont!
104 I was designing an environment that in every way could accommodate children learning what they have to learn in order to conduct themselves physically and safely, without getting into trouble with the operations of the environment, so an adult would never have to dont the children or discourage their curiosity-initiatingi.e., experimentsfor fear that a child might get hurt.
105 * * *
107 FIGURE 49. O-Volving shelves
108 I then decided my O-Volving shelves would be very logical for use in a library. I designed a proposed library project for Princeton University which, although not built at that time, would be very practical if used in the future. It had a deep, fifty-meter-in-diameter, circular silo well going far below into the ground, with walls that were thoroughly waterproofed on their outside. Above this deep circular well I mounted two levels of Octetruss floors, and above them a hemispherical geodesic dome sixty meters in diameter. I designed a radial arrangement of many consoles on the librarys ground floor, each within a library book category. Instead of taking elevators to the right floor and walking to the shelves, the O-Volving shelves would bring the one-meter-long shelves of books to youovolving vertically before your eyes, fast or slowly, until the right shelf arrives and you locate your book.
109 All the vertical bookshelves evolving was actuated by an electric push button and high-speed motor. It could be run by you at a speed suitable for your adequate inspection of the contiguous titles. Any book-seeker who wants to can dial for the book by computer-entered title or description, and it will ovolve to the seekers window at high speed. When the book arrives at the console, it is practical to have it pneumatically and mechanically opened behind the console window for the readers intimate viewing.
110 The reader cannot put hands on it, possibly to damage it. By push button the viewer at the console can also order a Xerox copy of any or all of the books pages. Also by push buttons the viewer can order a copy of the book for purchase. At the exit door of the library the Xeroxed pages or the purchased book will be waiting for credit-card purchase.
111
Human being
112 O-Volving console floor placement patterning, Princeton University Library project
113 Figure 50.
114 In the Princeton University design there were two decks of consoles. One was for the book-untouching, general library visitor; the other deck, twenty feet above the ground level entrance, would be accessible only to research accredited visitors, who could remove the books from the shelves and open them after they ovolved into place. The O-Volving consoles on both decks would be triangularly arrayed all around the librarys circular decks in a pattern of as-close-to-one-another-packing as possible without making the viewer feel crowded. The many perpendicularly book-loaded, O-Volving shelves would be parallelly suspended within the vast and deep under-ground air-conditioned silos. In terms of overall initial and operating costs compared to those of a multilevel, searchingly walk-around, fixed-steel-book stacks library, my design solution costs are extremely favorable.
115 The O-Volving shelf technology was perfected operationally to everyones satisfaction at Beech Aircraft thirty-five years ago. The principle is now completely sound, only awaiting application.
116 * * *
117 In the early 1960s I was commissioned by a Japanese patron to design one of my tetrahedronal floating cities for Tokyo Bay.
118 Three-quarters of our planet Earth is covered with water, most of which may float organic cities.
119 Floating cities pay no rent to landlords. They are situated on the water, which they desalinate and recirculate in many useful and nonpolluting ways. They are ships with all an ocean ships technical autonomy, but they are also ships that will always be anchored. They dont have to go anywhere. Their shape and its human-life accommodations are not compromised, as must be the shape of the living quarters of ships whose hull shapes are constructed so that they may slip, fish-like, at high speed through the water and high seas with maximum economy.
120 Floating cities are designed with the most buoyantly stable conformation of deep-sea bell-buoys. Their omni-surface-terraced, slope-faced, tetrahedronal structuring is employed to avoid the lethal threat of precipitous falls by humans from vertically sheer high-rising buildings.
121 The tetrahedron has the most surface with the least volume of all polyhedra. As such it provides the most possible outside living. Its sloping external surface is adequate for all its occupants to enjoy their own private, out-side, tiered-terracing, garden homes. These are most economically serviced from the common, omni-nearest-possible center of volume of all polyhedra.
122 All the mechanical organics of a floating city are situated low in its hull for maximum stability. All the shopping centers and other communal service facilities are inside the structure; tennis courts and other athletic facilities are on the top deck. When suitable, the floating cities are equipped with alongside or interiorly lagooned marinas for the safe mooring of the sail and powerboats of the floating-city occupants. When moored in protected waters, the floating cities may be connected to the land by bridgeways.
123 In 1966 my Japanese patron died, and the United States Department of Housing and Urban Development commissioned me to carry out full design and economic analysis of the floating tetrahedronal city for potential U.S.A. use. With my associates I completed the design and study as well as a scaled-down model. The studies showed that the fabricating and operating costs were such that a float-ing city could sustain a high standard of living, yet be economically occupiable at a rental so low as to be just above that rated as the poverty level by HUD authorities. The secretary of HUD sent the drawings, engineering studies, and economic analysis to the Secretary of the Navy, who ordered the Navys Bureau of Ships to analyze the project for its water-worthiness, stability, and organic capability. The Bureau of Ships verified all our calculations and found the design to be practical and water-worthy. The Secretary of the Navy then sent the project to the U.S. Navys Bureau of Yards and Docks, where its fabrication and assembly procedures and cost were analyzed on a basis of the floating city being built in a ship-yard as are aircraft carriers and other vessels. The cost analysis of the Navy Department came out within 10 percent of our cost-which bore out its occupiability at rental just above the poverty class.
124 At this point the city of Baltimore became interested in acquiring the first such floating city for anchorage just off-shore in Chesapeake Bay, adjacent to Baltimores water-front. At this time President Lyndon Johnsons Democratic party went out of power. President Johnson took the model with him and installed it in his LBJ Texas library. The city of Baltimores politicians went out of favor with the Nixon administration, and the whole project languished. The city of Toronto, Ontario, Canada, and other cities of the U.S.A. are interested in the possibility of acquiring such floating cities. Chances of one being inaugurated are now improving.
125 In relation to such floating cities it is to be noted that they are completely designed under one authority, and when they become obsolete, they are scrapped and melted and the materials go into subsequent production of a greatly advanced model whose improvements are based on earlier experiences as well as the general interim advances of all technology.
126 There are three types of floating cities: There is one for protected harbor waters, one for semi-protected waters, and one for unprotected deep-sea installations. The deep-sea type is supported by submarine pontoons positioned under the turbulence, with their centers of buoyancy 100 feet below the oceans surface. Structural columns rise from the submarine pontoons outwardly through the water to support the floating city high above the crests of the greatest waves, which thus pass innocuously below the citys lowest flooring, as rivers flow under great bridges. The deep-sea, deeply pontooned floating cities will be as motionless in respect to our planet as are islanded or land-based cities.
128 FIGURE 51. Triton Floating City
129 There are also deep-sea spherical and cylindrical geodesic floating cities whose hulls are positioned entirely below the ocean surface turbulence. Only their vertical entrance towers penetrate outwardly through the disturbed surface waters. The occupants of submarine cities with their vertical towers penetrating outwardly above water can be serviced by helicopters landing on the tower-top platforms. Such pontooned or hulled submarine cities also can provide safe mid-ocean docking for atomic-powered cargo-and passenger-carrying submarine trans- ports. With their submarine hulls locked together below the turbulence, a safe passageway can be opened between them.
130 Even in mild weather docking cannot be done on the open water surface of the ocean. Even the mildest old-sea or ground swells would roll any two ocean ships great tonnages into disastrous hull-smashing clashes. Relative mass attraction is proportional to the product of the masses of the interattracted pair multiplied by the sec-ond power of the relative proximity changes. When any two oceangoing steel vessels come within critical proxim-ity, their interattraction increases as the second power of their relative distance. Their interattraction is fourfolded every time the distance between them is halved. This chain-attraction-increasing force pulls them sideways to-ward one another, ultimately to touch and chew up one anothers skins-that is, unless one is maneuvered in time backward or forward away from the other. Land harbors are essential for surface docking or inter-tie-up of ships of any size. There are relatively few big-ship harbors in the world. This fact, and the world-around scarcity of such good harbors as Athens Piraeus, Frances Cherbourg, It-alys Venice, the U.S.A.s New York, or Tokyos Yokohama, have greatly affected the geographical patterning of world history. The new ability to transfer cargoes at sea could completely alter world economic balances and could bring ships once more into economic competition with air-planes. The recent decades development of seventy-knot submerged speed of the great atomic submarines, complemented by floating cities, could herald the beginning of a new era of subsurface oceanic traffic.
131 In due time small cruising yachts also will be able to sail or power around the world in safe, one-day runs from one protected floating citys harbor to the next.
132 * * *
133 In 1958 I saw clearly the progression of technical events altering all old engineering concepts regarding the relative increase in the overall weights of structures-and designed my sky-floating tensegrity structures, which I call Cloud Nines.
134 A 100-foot-diameter, tensegrity-trussed, geodesic sphere weighing three tons encloses seven tons of air. The air-to-structural-weight ratio is two to one. When we double the size so that the geodesic sphere is 200 feet in diameter, the weight of the structure increases to seven tons while the weight of the air increases to fifty-six tons-the air-to-structure ratio changes as eight to one. When we double the size again to a 400-foot geodesic sphere-the size of several geodesic domes now operat-ing-the weight of the air inside increases to about 500 tons while the weight of the structure increases to fifteen tons. The air-weight-to-structure-weight ratio is now thirty-three to one. When we get to a geodesic sphere one-half mile in diameter, the weight of the structure itself becomes of relatively negligible magnitude, for the ratio is approximately a thousand to one.
135 When the Sun shines on an open-frame aluminum geodesic sphere of one-half-mile diameter, the Sun penetrating through the frame and reflected from the aluminum members of the concave far side bounces back into the sphere and gradually heats the interior atmosphere to a mild degree. When the interior temperature of the sphere rises only one degree Fahrenheit, the weight of the air pushed out of the sphere is greater than the weight of the spherical-frame geodesic structure. This means that the total weight of the interior air plus the weight of the structure is much less than the surrounding atmosphere. This means that the total assemblage of the geodesic sphere and its contained air will have to float outwardly, into the sky, being displaced by the heavy atmosphere around it.
136 When a great bank of mist lies in a valley in the morn-ing and the Sun shines upon it, the Sun heats the air inside the bank of mist. The heated air expands and there-fore pushes some of itself outside the mist bank. The total assembly of the mist bank weighs less than the atmosphere surrounding it, and the mist bank floats aloft into the sky. Thus are clouds manufactured. As geodesic spheres get larger than one-half mile in diameter, they become floatable cloud structures.
137 If their surfaces were draped with outwardly hung polyethelene curtains to retard the rate at which air would come back in at night, the sphere and its internal atmosphere would continue to be so light as to remain aloft.
138 Such sky-floating geodesic/tensegrity spheres may be de-signed to float at preferred altitudes of thousands of feet. The weight of human beings added to such prefabricated Cloud Nines would be relatively negligible. Many thousands of passengers could be housed aboard one-mile-diameter and larger cloud structures. The passengers could come and go from cloud to cloud, or cloud to ground, as the clouds float around the Earth or are an-chored to mountaintops.
140 FIGURE 52. Cloud Nine Floating Tensegrity Spheres
141 While the building of such floating clouds is some years in the future, we may foresee that, with the floating tetrahedronal cities; air-deliverable skyscrapers; submarine is-lands; sub-dry-surface dwellings; domed-over cities; flyable dwelling machines; and rentable, autonomous-living, black boxes, man may be able to converge and deploy around Earth without its depletion.
142 * * *
143 In the 1920s Frank Lloyd Wright made a drawing of a mile-high tower building. Engineering feasibility studies were never made.
144 In 1966 I was contracted by a Japanese patronMatsutaro Shoriki, owner of the Nippon Television Network Corporationto undertake a design feasibility study for a 12,250-foot-high observation tower, which was to overtop the height of Mount Fuji on the island of Honshu. In view of the fact that at that time the worlds tallest building was the Empire State Building at 1472 feet, including TV towers, and the tallest man-made structure was a 2000-foot TV transmission tower a mere one-sixth the proposed towers height, totally-new-for-humanity considerations necessarily came into play. Our tightly phrased, detailed engineering report contained 10,000 words.
145 The patrons given budget-able limit for the project was $300 million. The feasibility study showed that a 12,250-foot tower that performed all the functions desired by the towers patrons could be met by present technology, but not at the $300-million figure. The study, therefore, also included critical details covering the construction of an engineeringand function satisfying tower of 8000 feet, which could be produced for $300 million.
146 The studies showed that there was nothing that presently operative technology could not cope with even at the 12,250-foot Mount Fuji height. Almost all objectionable features of the 12,250-foot tower were eliminated at the 8000-foot height.
147 Such formidable safe working assumptions had to be adopted as that of icing one foot thick covering the towers entire surface; wind loadings of 250-mile-per-hour winds; allowance for ice dropping into protected areas; and unitary five-story-high, air compression and decompression elevators in order to accommodate pay-for-itself observatory traffic, etc. A section of the report even covered helicopter rescue operations from the observation section at the top should the elevator fail.
148 * * *
151 FIGURE 53. Tokyo Tower
153 FIGURE 54. Tokyo Tower
154 With all human beings furnished with their personal, auto-matic, computer-programming, chipscontaining credit cards, the computers will be making it clear that all humanity will be able to employ their along-the-streetside-controlled, slot-machine-like, travel-program-and-ticket dispensers to get themselves from any part of the world to any other part of the world in the shortest possible time.
155 The world computers will keep track of all available air-travel passenger spaces in all directions. The airlines will operate on a load-shuffle-and-shuttle, special-destination-pallet basis. When each eight-seat-or-bed-capacity pallet is full, it will be hang-loaded by local cranes onto overhead monorails and electric-trolleyed into an en-route-to-destination plane. The destination-pro-grammed, eight-place pallets will be overhead-monorail, electric-trolley loaded aboard through each planes tail.
156 The planes can carry many pallets with many different ultimate destinations.
157 For example, there will be a pallet for Sydney, Australia, being loaded in New York Citys Waldorf-Astoria Hotel lobby. When it is full, the computer will have it overhead-monorailed to the first overseas plane going most directly toward Sydney-say to Mexico City. At Mexico City it will be computer-overhead-trolley-transferred to a plane for Papeete, Tahiti, in the Society Islands, and thence into an-other plane leaving in a short space of time from Papeete directly to Sydney.
158 At each world airport the computers will resort the variously destined pallets, sending them forward in the most efficient manner. The pallets will be computer-shuttle-sorted in and out of the planes through the planes hinged-open tails and continually rerouted to their ultimate destination in the computer-determined swiftest manner.
159 The pallets themselves will accommodate all the passengers luggage inside the floor-truss space below the passengers seats. Passengers will never be separated from their luggage. On arrival at destination their pallet will take them downtown to their destination hotel.
160 There will be a variety of pallet designs. All the pallets for long-distance, multi-houred flights will have all their seats convertible by elevation into comfortable full-length beds.
161 Travelers can even start their trips in a pallet in the lobby of their hotel. The pallet will be overhead-trolleyed into a truck thus to produce in effect a small bus. Pallets will be loaded into trucks through their tails by over head trolley raiIs.
162 Because the world-around computer system is continually rerouting its pallets to adjust for unexpected de-lays, there will be no way of planning to hijack a plane from within a pallet.
163 * * *
164 We now find that every human being generates a self-surrounding, ultra-ultra-ultra-high-frequency electromag-netic field-exquisitely ephemeral but exquisitely real. Each individuals field alternates between positive and negative. When an individual is feeling predominantly negative mentally, the field is negative, and vice versa.
165 The sensitivity of the satellite-mounted, electronic, spy-sensing equipment developed by both Russia and the United States is such that satellites, dynamically space-stationed around the world, can take continual readings of the sum-total proportions of positive and negative electromagnetic field reactions of all humanity in respect to world-numbered proposalsto be broadcast at given times all around the world-regarding computer-discovered solutions to each and every world-human-affecting problem.
166 The computer will make it quite possible to continually confront humanity via the electronic media with its own worlds nonpolitical, professionally trained, and examination-qualified managements successively evolved human-problem-solution proposals.
167 With adequate time to get the world informed of each of the nonpolitical, professional world-management committees specific computer-derived problem-solution proposals, at specific world-around times readouts will be broadcast reporting the world majoritys disposition to-ward any one proposed solution. All humanity can keep track of the changing disposition of the majority of all humanity and of how many are positive or negative in respect to any world-around, simultaneous, periodical presentation of any given proposition. After a proposition has been exposed for a given period of days and a 75-percent majority is attained, the professional-management world committee will be authorized to put the proposition into the world around industrial production and service.
168 Thus will begin the worlds first real tamper-and corruption-proof democracy. Humanity will make mistakes, but the minority, knowing that this is the first true democracy, will often go along spontaneously with the majority, knowing that if it develops that the majority has made a bad judgment, negative readings will swiftly occur as society discovers that it has chosen the wrong course.
169 Norbert Wieners and Claude Shannons cybernetic feedbacks, which implement their information theory, will swiftly and progressively correct the decisions and thereby the historical course of world-around citizenry evolution. Very swiftly all humanity will learn to think about total Earth, total humanity, and total accumulated knowledge, total resources, etc., and will begin to make some powerful omni-humanity, omni-Universe-considerate decisions.
170 When a 51-percent majority shows that humanity now regrets the previous decision, the world management committee will propose a means of correcting the course, and the foregoing processes will be repeated.
171 * * *
172 Refer to my 760-year Pure Science Acceleration Chart and the accompanying text in my book
Earth, Inc. (Doubleday, 1973, pp. 3–26).
Change: Add to bibliography In that piece and its
chart, first published by me in 1959, I predicted that by 1985 we humans would be doing
something as presently incredible as sending ourselves around the world by radio.
Whatever this presently incredible form of circumnavigation may be, it will be right on
schedule.
173 We have gradually been learning how to substitute various inanimate mechanical parts in our total human organic assembly. We have also been learning how to synthesize more and more of the atomic and molecular ingredients of our organic assembly. We have also been learning from the virologists DNA-RNA about all the unique biological-design programming of various biological species. We have also been learning that you and I and life are not the physical equipment that we use. Life itself is entirely metaphysicala pattern integrity.
174 Of timely relevance to natures progressive disclosure that life is not physical, in early 1980 it was reported in science journals that a seventy kilogram baby mammoth had been found preserved for 44,000 years in a chunk of hitherto-never-defrosted Siberian ice. Some of the animals molecules were still alive when the beast was found, occasioning the observation that biochemists are trending to grow organismsperhaps as complex as the woolly mammothfrom a single molecule of DNA or any part of the physical organism. But life is not the physical molecule or a morsel of flesh or a blood corpuscleas we have been progressively discovering. These are all minor complexes of inanimate atoms.
175 Now, in July 1980, at eighty-five years of age, I have consumed over 1000 tons of food, water, and air, which progressively, atom by atom, has been chemically and electromagnetically converted into all the physical components of my organism and gradually displaced by other in come atoms and molecules. Now all but 146 pounds of that 1000 tons have been progressively discarded. In 1895 I weighed in at seven pounds-at 146 pounds in 1980 my organism is the same slightly evolved and aged personality pattern being manifest in pure principle by the total complex of unique behaviors of the only-inpure-principle-existent inanimate atoms.
176 Each one of us is a unique behavioral pattern integrity. The metaphysical you and I are not the coarsely identified cornflakes and prunes that we ate in the days before yesterdayssome of which became constituents of what are identified momentarily as our flesh and hair functions.
177 Our human organisms were designed to initially operate only nakedly and only within the tropical-island areas of the Earthian biosphere. However, our metaphysical minds were given the capability progressively to discover and comprehend many of the principles governing various complex environment formulations as well as the principles that must be employed in order to permit human presence under those various intolerable-to-naked-human conditions. Excursions to the Moon require an additional special set of environment-suitable, external sensing-and-manipulating equipment.
178 We have already operative the equipment to accommodate abstract, metaphysical you or I observing various Moonscapes, which does not require our donning space suits. It requires only our subscribing to the National Geo-graphic. We have now achieved exactly the right physical-information-gathering-and-problem-solving artifacts for the weightless, invisible, metaphysical you and I to employ our instrumental extensions to occupy, explore, and operate in scientific depth on the Moon, Mars, Venus, and the other celestial bodies of our solar system.
179 In thinking about what Ive just said, remember that no human has ever seen or sensed outside of self. All our sensing is nerve-relayed inward to be directly sensed only in our brain. We have become so accustomed to the reliability of the information-relaying-inward to our brain that we now mis-assume that we are seeing things directly outside ourselves.
180 Let us consider an athletea hockey player who has played for a number of years on his citys professional team in his citys principal rink. He is injured and is hospitalized for months. He tunes his hospital-room television to his teams hockey games in their regular rink. He tends to see what is going on and groans and grins as though he were really present, on the rink. That is the way our sight system works, seemingly to see things transpire out-side ourselves.
181 We noted earlier that all living organisms other than humans have special, integral organic equipment that gives them special advantage in special terrestrial environments-the seaweed that lives exposed to air at low tide and is submerged at high tide, the penguins that live and flourish only at waters edge in the Antarctic. Within a larger cosmic scheme humans are given the special physical equipment to flourish initially only within the planet Earths biosphere. But humans are also given the meta-physical equipment with which to discover the principles governing metaphysical information-gathering and physical action-taking within extreme macro-micro ranges of physical Universe unreachable directly with the naked organisms primary equipment as initially implemented. It is possible for humans to design, produce, and enclose themselves within such awkward equipment as that which permits their effective coping with nakedly lethal environmental conditions such as those on the Moon. But having visited the Moon to prove our capability thus to cope, we discover that computer-controlled mechanical equipment can be rocketed to the Moon or elsewhere and can do an even better job of exploring and visually record- ing macro-and micro-remote environments, as well as their respective invisible physical, chemical, and electro-magnetic phenomena. While the data that can be thus instrumentally attained are inherently fascinating, their real value consists of what may be discovered and comprehended thereby of the generalized scientific principles demonstrated to be operative in these remote-from-everyday-experience environments.
182 Eventually we realize that what is transpiring is that the metaphysical weightless mind of humansthe real you and Iis spontaneously preoccupied with hitherto-unharvested local Universe information and therefrom is gleaning omni-Universe-operative principles and there-with is solving local Universe problems in the comprehensively responsible maintenance of the local integrity of eternally regenerative Universewhich we have hereto-fore hypothesized as the reason humans are included in the cosmic scheme.
183 Our most prominent present local Universe problem is how to wean humanity from metabolic sustenance only by exploiting natures local Universe energy savings account-energy being locally imported by cosmic evolution design to produce a new star ten billion years hence. How can we convince those in power the world around that we can live handsomely as supplied only by our daily income of cosmic energy? The answer is we cant convince them. Only the cosmic wisdom manifest in inexorable evolution can cope with such matters.
184 When I was twenty-seven years of age, Earthian humanity knew of only one galaxyour own Milky (Latin: Ga-lactic) Way. A year later astronomer Hubble discovered another galaxy. During the subsequent fifty-seven years human astronomers and astrophysicists have discovered two billion more galaxies, all doing their galactic acts within the eleven-and-one-half-billion-light-year-radiused sphere of humanitys present limit of omnidirectional observing.
185 The average star population of each of these two billion known galaxies is 100 billion. This is to say that the thus-far-discovered star population is two times 1020 that is the integer two followed by twenty zeroes. Within this 200-quintillion star group our star Sun ranks among the pygmies. Each one of the 200 quintillion known stars is an atomic-energy plant. There is nothing new or cosmically illogical about atomic-energy plants. Naturethe intellectual integrity designer of eternally regenerative scenario Universedesigned human organisms to serve meta-physically weightless mind as the physical instruments of exploration and of development-first of the planet Earths biosphere, and thereafter of that planets local Universe operating planetary companions, and possibly later other whole star systems, thus to fulfill their cosmic functions as local Universe information-gatherers and local-Universe problem-solvers. As we have also discovered early in this book, natures design of the human minds complex organic instrument of exploration and information-gathering-known as the human body-solved all the structural compression problems of these exploratory organisms with water, which boils and freezes within very limited thermal range in respect to the vast range of cosmic temperatures. We also discovered that all the biological organisms-botanical or zoologicalwhich altogether comprise the terrestrially regenerative system ecology (no ecology no humans). Radiance from a candle diminishes rapidly as we recede from the candle. The intensity of all radiation from all radiant sources diminishes as the distance from the source increases. As Einsteins formula anticipated and physical experiments have proved, the sum-total energy content of all the radiation distributed radially outwardly in all directions from the source remains the same but the amount of energy concentrated at any one spherical surface point decreases as the distance from the source increases. Draw a picture of concentric circles, each circle divided into identical arc lengths. The further out we go more arcs of the same length are required to constitute the greater circles. Naturethe impeccable designer that knew exactly how to design and produce what we do not know how to design and produceour human brain, out optical systems, etc., let alone all the complex interplays of all the organisms, visible and sub-visible, of all ecologyhas discovered and heeded its own designing laws which state that Sun energythe atomic energy plant called Sunis essential to life on planet Earth but that its radiation is too intense for direct exposure by many of the constituent members of the total ecological regeneration team. Such too-radiation-sensitive ecological constituents are designed to operate only within the Earths earth or at its sea bottoms.
186 We have also learned earlier that in order to produce these limited-temperature-range organisms nature has designed them to be evolved and incubated only within the very special environmental conditions of planet Earths biosphere. Nature as the omni-informed and omni-concerned, omni-considerate cosmic designer discovered and heeded the fact that human organisms and their absolutely essential ecological support complex could not operate safely at a distance of less than ninety-two million miles away from their nearest atomic-energy plantthe Sunand all the latters lethal radiation involvements. The would-be exploiters of atomic energy on board our planet Earth will in due course discover there is no way for them to solve atomic-energy-radiation waste-disposal problems save by rocketing it all back into the Sun, where it belongs. Humans will then have to learn how to keep all humans and their ecological support system operating successfully on our vastly adequate daily income of solar atomic energy.
187 Cosmically acceptable and effective decisions of humanity regarding such matters will not be made by leaders single or plural, political or religious, military or mystic, by coercion or mob psychology.
188 The effective decisions can only be made by the independently thinking and adequately informed human individuals and their telepathically intercommunicated wisdomthe wisdom of the majority of all such human individualsqualifying for continuance in Universe as local cosmic problem-solvers-in love with the truth and in individually spontaneous self-commitment to absolute faith in the wisdom, integrity, and love of God, who seems to wish Earthian humans to survive.





















